Large and Complex Projects - Level 3
Provides a fully detailed project control schedule listing all activities and time scales as the method of control and monitoring for high value, complex and time sensitive projects.. A Level 3 project control document will sequentially list the major documents, the process deliverables, the engineering materials requisition list, purchase order schedule, manufacturing progress reports and others as determined necessary. As with the Level 2 system, the production controller shall input earned work information and other key data to produce necessary reports.
All reports can incorporate man hour resources per activity and provide a variety of S curves to monitor progress overall, budgets and specific area (discipline) progress. These provide, at a glance, a detailed status of the project and indicators of likely future progress.